Abstract

This paper presents preliminary results from a laboratory backfill model test in order to explain the effect of temperature change during the cement hydration on the total stress within cemented paste backfill. It is conducted via temperature control test in the absence of the cement. This investigation is an attempt to resolve an anomalous behavior reported in recent full scale monitoring reports, where the total vertical stress at the stope base shows a progressive increase after backfilling is terminated. The result in this paper shows that the total vertical stress is not affected by the level of the temperature but rather by the temperature gradient. The empirical relationship between the temperature gradient and the change in the total vertical stress is proposed. The total stress anomaly found in the full scale monitoring of paste backfill could be explained by the finding. © 2018, Int. J. of GEOMATE.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.