Abstract

The main bridge of Quanzhou Bay Sea-Crossing Bridge is a composite girder cable-stayed bridge with span arrangement (70+130+400+130+70) m and with double pylongs,separated decks.It’s the first time to using the dry joints assembly in composite girder cable-stayed bridge,the technology of precasting and installing for integral segment is introduced.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.