Abstract

The paper is dedicated to waste processing management in waste processing technology. Processing of scrap concrete waste, similar in composition and condition to traditional raw materials, is economically and ecologically feasible. Secondary crushed stone obtained by crushing scrap of reinforced concrete panels in demolished five-storey apartment blocks of the first phase was studied. It is shown that concrete with scrap concrete waste shows strength properties similar to primary concrete and helps organize waste-free production. The methods of recycled waste usage, especially usage of secondary crushed stone made of crushed concrete scrap, are becoming ever more relevant with every passing year. Imported concrete aggregate volumes can be reduced by 15-30% due to usage of secondary crushed stone. Consideration of industrial waste problem and methods of solving this problem by using waste in construction industry, including secondary crushed stone made of crushed concrete scrap, is made. Annually, about 11.5 million tons of construction waste is generated in Moscow. The use of industrial waste similar in terms of composition and condition of traditional raw materials unquestionable from economic and environmental point of view. This study showed that concrete using fine granulated blast furnace slag as cement additives has higher initial strength characteristics.

Highlights

  • IntroductionConstruction waste in Moscow is generated as a result of demolition and reconstruction of buildings and structures, while producing construction materials, details and components; after utility systems reconstruction etc

  • Construction waste in Moscow is generated as a result of demolition and reconstruction of buildings and structures, while producing construction materials, details and components; after utility systems reconstruction etc.Waste volumes generated by five-storey typical apartment buildings clearance, account for the bulk of total balance of construction waste producing in the city

  • Most of the produced construction waste in Moscow is transported to landfills and dump sites, including unauthorized landfills, located within the city limits and

Read more

Summary

Introduction

Construction waste in Moscow is generated as a result of demolition and reconstruction of buildings and structures, while producing construction materials, details and components; after utility systems reconstruction etc. Waste volumes generated by five-storey typical apartment buildings clearance (first period of prefabricated construction), account for the bulk of total balance of construction waste producing in the city. While construction waste is a secondary raw material, its usage after processing into secondary crushed stone and sand and crushed stone mix can reduce costs for new urban building, reduce the load on municipal landfills, exclude formation of unauthorized landfills, and preserve land resources currently used as landfill zones to construct, for example, parks. To reach expected great volume of crushed stone and sand, produced from crush products of concrete and reinforced concrete elements, it requires codes and standards, which specify certain requirements for new types of products

Methods
Results
Conclusion
Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call