Abstract

ABSTRACTThe objective of this study is to evaluate the technical and economic feasibility of stand-alone hybrid photovoltaic (PV)/battery and PV/battery/fuel cell (FC) power systems for a community center comprising 100 households in Kunming by using the Hybrid Optimization Model for Electric Renewable (HOMER) software. HOMER is used to define the optimum sizing and techno-economic feasibility of the system equipment based on the geographical and meteorological data of the study region. In this study, different hybrid power systems are analyzed to select the optimum energy system while considering total net present cost (NPC) and levelized cost of energy (COE). The results showed that the optimal hybrid PV/battery system comprised 500 kW PV modules, 1200 7.6-kWh battery units, and 500 kW power converters. The proposed system has an initial cost of $6,670,000, an annual operating cost of $82,763/yr, a total NPC of $7,727,992, and a levelized COE of $1.536/kWh. While the PV/battery/FC power system is possible, the cost increases were due to the investment cost of the FC system. The optimal PV/battery/FC system has an initial cost of $6,763,000, an annual operating cost of $82,312/yr, a total NPC of $7,815,223, and a levelized COE of $1.553/kWh.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.