Abstract

For developing nations such as Iraq, electricity access in rural areas, especially those which are remote, is limited. Thus, the present study explores the electrical needs of the city of Zerbattiya, Iraq. The proposed system’s components include solar panels, wind turbines, diesel generators, and batteries. This research proposes a techno-economically feasible and optimal sizing for each component to generate electricity for the village. Particle swarm optimization (PSO) algorithm was used in this research by using MATLAB. The ideal setting of a hybrid renewable energy system (HRES) is achieved by considering the lowest possible COE with the highest reliability and possible value of renewable energy factors. Reliability is gauged on the basis of “loss of power supply probability” (LPSP). Results showed that the respective optimal values for NPV (30), NWT (30), NDG (3), NBT (281), COE (US$0.142), LPSP (0.002085), reliability (99.791) and renewable factors (21.42%). The findings further demonstrate that the algorithm was able to achieve optimal solutions to reduce overall cost, quickly and accurately. In conclusion, implementation of HRES was found to be an apt method of meeting electrical needs of remote rural areas, not only in Iraq, but also other developing nations with similar climates.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.