Abstract
Off-grid, rural island communities seldom have access to electricity and for those that do, the quality and availability are unsatisfactory. Gilutongan Island is one of the many off-grid islands in the Philippines with very limited access to electricity. Residents are provided with electricity from 6:00 p.m. to 10:30 p.m. through a 194-kVA diesel generator, paying US$ 0.14 per bulb and US$ 0.16 per outlet. Payment for electricity is collected on a daily basis with collections usually amounting to US$ 74.32 per day. With consumption totalling to 276 kW for 4.5 h, this roughly translates to a cost of US$ 1.21 per kWh. Using Hybrid Optimisation Model for Electric Renewables (HOMER), this paper presents a techno-economic analysis of a proposed cost-effective power generation system for the island, aiming to provide electricity access to the residents 24 h a day with reduced energy cost. Two options are considered: diesel-solar hybrid and solar only. Considering location constraints of the island, the hybrid system proves to be more effective, reducing cost of energy by 70% to US$ 0.3556 per kWh. Determining the load profile of the island is imperative in creating the system, dictating its size and capacity, which in turn affects its sustainability.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.