Abstract
Logistics Journal, Vol. 2008, Iss. August - This article deals with complex material flow systems and series connections of conveyor and op-erating elements. These can be characterised by a specific availability. The thus resultant overall availabil-ity of necessary “technical throughput” of the individual elements for the achievement of a specified throughput. When the conveyor and operating elements are subjected to a stochastic distribution, the interposition of buffers is necessary but these can also lead to a reduction of the necessary throughput due faults. The system behaviour of complex installations can only be investigated by simulation. The parame-ter changes required in order to achieve specific target values can also be determined by simulation runs in iteration loops.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have