Abstract

Routine preventive maintenance of the DOE Coal Fired Flow Facility (CFFF) is being performed. Modernization programs, funded under subcontract from Foster Wheeler Development Corporation by the DOE HIPPS Program, have been completed on the coal processing system, the data acquisition and control system and the control room. Late in the quarter, all work was stopped on maintenance of the CFFF at DOE instruction. Environmental restoration actions continued with monitoring of groundwater wells and holding pond effluent. Progress is reported on the approved groundwater remediation plan. Actions are underway to dispose of spent seed/ash mixtures and excess coal remaining from the MHD POC program. The status of five (5) High Temperature Superconductor (HTS) projects is reported. A summary is included of the results attained with sol-gel experiments with buffer layers and YBCO. The status of the cost/performance study of electron beam and PLD deposition is pre-sented. A summary of work performed in diagnostics for real time control of HTS processes is presented.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.