Abstract

Feasibility Study-II examined a high-performance Neutrino Factory providing 1×10 20 neutrinos per year aimed at a long-baseline detector. The Study was sponsored jointly by BNL and the Neutrino Factory and Muon Collider Collaboration and is based on a 1 MW proton driver operating at 24 GeV , i.e., an upgraded version of the AGS accelerator. Compared with the earlier FNAL-sponsored study (Feasibility Study-I), there is a sixfold improvement in performance. Here we describe details of the implementation of Study-II concepts and discuss their efficacy. Alternative approaches that will be pursued in follow-on R&D activities are also described briefly.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.