Abstract
AbstractThis paper describes several modernization aspects of the process 8 MW air compressor and its driver. The main aim of the revamp was to increase internal efficiencies of both the compressor and turbine and increase the load of the compressor without additional power consumption. The original pressure ratio was preserved. To meet these requirements a redesign of the flow path of both machineswas necessary.Moreover, the turbineworking conditions were changed from extraction-condensing to condensing. In terms of compressor, impeller blade redesign, adaptation of diffusers and Abradable seals were a part of the scope. The revamp was completed in April 2014 with all the requirements met. This paper covers the general outline and a comparison of the original and modernized machine operating parameters, design and technical assumptions and also describes some problematic issues which occurred during the realization of the project.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.