Abstract

Access to clean, cost-effective, and available energy is essential for the sustainable development of a country. Nowadays, the production of energy from fossil fuels has environmental and economic disadvantages. In this context, this work proposes to study the technical and economic aspects of the replacement of a 20 MW Light Fuel Oil (LFO) thermal power plant by a hybrid Photovoltaic Pumped Hydro Storage System (PV-PHSS) power plant in northern Cameroon. The objective is to minimize the total life cycle cost (TLCC) of the proposed hybrid system with a loss of power supply probability (LPSP) below a defined limit. To obtain optimal results, several meta-heuristics such as Artificial Bee Colony (ABC), Water Cycle Algorithm (WCA), Grey Wolf Optimizer (GWO), and African Vulture Optimization Algorithm (AVOA) have been used. Moreover, the optimal sizing of the hybrid system components was performed under MATLAB software using real-time information and meteorological data from the selected site. All the algorithms achieved good results. However, the WCA algorithm delivered a slightly better result than the other algorithms.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call