Abstract

The management decision fault during prophase demonstration, design and operation on power station can be avoided effectively by technical and economic evaluation of power station project. In this paper, the sintering circular-cooler waste heat power station in WISCO is taken as an example. Through analyzing the two methods of technical and economic evaluation on power plant and constructing the evaluation system of sintering waste heat power plant, the technical evaluation on overallcondition of power plant is made by adopting the ways of contrastive analysis, and index weight value of power plant is computed by analytic hierarchy process, then power station is evaluated through combining the two evaluation methods. And the bandwidth of net power output basic parameters of per ton of sinter waste heat is determined. The study results can provide reference basis for the initiating project and technology decisions of waste heat power station.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.