Abstract
The return on investment (RIO) of a Liquefied natural gas (LNG) power plant is lower than that of conventional power plants with high pollution due to the “take or pay” supply mode of natural gas and the two-shift peak shaving operation mode in the LNG power plants. . In this paper, firstly, based on the characteristics of the gas turbine combined cycle (GTCC) unit for peak shaving and standby application, it is proposed to calculate the generation cost of LNG power plants according to the depreciation of operation life. Secondly, through the sensitivity analysis of power generation cost, it is found that fuel price and average efficiency are the first influencing factors. Next, to reflect the environmental protection characteristics of LNG power plants, the on-grid price included in the environmental value is put forward innovatively based on the calculation of the environmental cost and environmental value of natural gas power generation.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: International Journal of Information System Modeling and Design
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.