Abstract

In this paper, the characteristics of two modes of high back pressure reconstruction techniques for 150 MW reheat turbine units were researched. One was reconstruction of double back pressure and double rotors and the other was one-off reconstruction of LP cylinder. The former redesigned for lower pressure(LP) rotors for running at high back pressure, and hydraulic coupling bolts adopted to achieve the switch of low pressure rotors that run at high and lower back pressures. The one-off reconstruction of LP cylinder has achieved the switch of static and dynamic blades between high and low pressure. The two reconstruction both realized heat supply on the high back pressure condition, utilized cold source loss and increased the unit efficiency. After reconstruction, the economic index under both normal back pressure condition and high back pressure heating condition have been obtained by performance test. Under the high back pressure heating condition, the unit heat rate reaches 3700-3800kJ/kW.h, and the thermal efficiency has achieved 95-97%.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.