Abstract

In port areas, with the progressive increase in maritime traffic, the problem of pollution is crucial especially when the port is near to an urban area. The cold ironing allows a reduction of pollutants satisfying the power demand of ships while they are at berth, replacing on board diesel engines. In this paper, the methodology of analysis of the electrical loads required by ships concerns the typical week of each month over a one year period. The power is provided by a cogeneration plant powered by natural gas. It is flanked by a Compressed Air Energy Storage system since the energy demand is linked to the presence of ships in port and so very variable over time. The heat waste is recovered in a heating district network for overall optimization. At last, the economical aspect has been evaluated to prove the feasibility of the whole system. The results, for the case of the port of Ancona, show that a 1.5 MW and 2 MW cogenerator covers the 83.05% and 92.5% of the electrical need of ships respectively, and the 61% and 74% of the thermal need of buildings over the period analysed. The coverage of the CAES system is not influenced by the rated power.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.