Abstract
As contemporary manufacturing companies embark upon the lean transformation, they are relying upon a more collaborative, cross-trained workforce that strives to deliver a quality product at the required time. This longitudinal study tracked five multifunctional work teams involved in a pull system implementation effort at an electronics assembly plant. This research examines the relationship between team characteristics including the inclination to collaborate, team flexibility and shared team priorities; and team performance measures that include performance to schedule, product quality and labour efficiency. Team member collaboration was positively associated with schedule performance and labour efficiency. Team flexibility was positively related to product quality. Finally, the concept of team priority consonance is introduced, which showed a positive association with schedule performance.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.