Abstract

The management of a complex engineering project is a difficult task that initially involves the division of the project into tasks; the selection of the right people; and the correct allocation of those tasks for the selected people. Team configuration process is typically performed by a manager based on his/her past experience and the available (though frequently scarce, uncertain and dynamic) information about the cognitive, personal and social characteristics of the potential team members. To support this decision-making process we propose TEAKS, a knowledge-based tool that given an initial team configuration and a set of tasks, simulates the most possible team performance. Its formal bases are Fuzzy Set Theory and Fuzzy Logic and it is implemented using Multi-Agent Systems technology in Java, JADE, JESS and FuzzyJESS. This tool was validated with an industrial project involving 23 team members and 23 tasks (ranging from task assignment to SAP administration, SQL programming and equipment connectivity).

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.