Abstract

The idea of task scheduling is to increase the efficiency of a system by minimising wasted time, evenly loading machines, or maximising the throughput of machines. Moreover, the use of appropriate scheduling algorithms often leads to a reduction in the energy costs of the process. Task scheduling problems are found in a variety of industrial areas, and their scale changes significantly depending on the problem. This review shows the extent to which task scheduling methods are used in industry. This paper presents methods and algorithms for solving task scheduling problems. In addition, an analysis of the possibility of using task scheduling methods to improve the efficiency of wastewater treatment plants was also conducted. This approach is based on the assumption of a balanced workload for multiple SBR reactors. Analysing the case of a wastewater treatment plant in Swarzewo City in northern Poland. The problem of scheduling tasks in a wastewater treatment plant has not been so far subject of research work.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call