Abstract

Multi-task scheduling networkis extended based on the complex network theory, from new angles and perspectives to study the multi-task scheduling. The description of method and related mathematical models of complex and multi-task directed network aregiven. Combined with topology of the product development process and their own characteristics,the evaluation model and algorithmto describe the importance of the event node are presented. It can assess the nature ofdifferent nodes effectively, including the key nodes, at the same time,the scheduling algorithm based on the importance of active nodes hasbeen proposed.The study has a certain significance toarrange the execution of tasksin complex product development process reasonably and realize optimal allocation of manufacturing resources.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.