Abstract

This paper discusses the compile time task scheduling of parallel program running on cluster of SMP workstations. Firstly, the problem is stated formally and transformed into a graph partition problem and proved to be NP-Complete. A heuristic algorithm MMPSolver is then proposed to solve the problem. Experiment result shows that the task scheduling can reduce communication overhead of parallel applications greatly and MMPSolver outperforms the existing algorithms.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.