Abstract
In an industrial environment, manufacturing systems may be subject to considerable uncertainties which could lead to numerous schedule disturbances. These disturbances prevent the execution of a manufacturing schedule as it was planned. The 'groups of permutable operations' method copes with this drawback by proposing a family of schedules instead of a unique one. However, the selection of the appropriate schedule that accounts for real-time disturbances represents a combinatorial optimisation challenge. In this paper, we propose a new decision-aid criterion for selecting the schedule that fits best the real state of the shop. This criterion is measured using a greedy heuristic that anticipates the maximum tardiness in a job shop scheduling environment. Simulation tests performed on benchmark problems show the usefulness of the proposed criterion compared to another frequently used criterion. The final results emphasise the usefulness of this criterion in a bi-criteria decision-aid system.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: International Journal of Intelligent Engineering Informatics
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.