Abstract

This paper describes a model for tactical planning of Norwegian petroleum production. The problem involves regulation of production levels from wells, splitting of production flows into oil and gas products, further processing of gas and transportation in a pipeline network. Blending and processing of gas is necessary to satisfy quality requirements in the markets. The problem is formulated with multi-component flows, regulation alternatives in production, non-linear splitting for chemical processing and linear quality constraints on composite products. Production and splitting are modelled with integer requirements. The model is implemented in Xpress MP with a Visual Basic supported user interface in Excel. It is constructed in cooperation with the major Norwegian oil company, Statoil and can identify optimal production patterns and assist in planning of possible shut-downs, demonstrate system robustness to customers and aid in contract negotiations.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.