Abstract

In construction, better practice has been sought through the employment of knowledge management. Interest in tacit knowledge has grown due to its importance for raising performance at all organizational levels. Aspects of the limits which tacit knowledge places on knowledge management approaches in construction are considered with the focus being upon broad knowledge management categories rather than the details of particular methods. The distinction between knowing how and knowing that coupled with examination of whether the main mode of knowing is tacit or explicit is used to analyse the relationship between tacit and explicit knowledge in construction. There are significant general theoretical difficulties with incorporating tacit knowledge into the objectivist knowledge management approaches which predominate in construction particularly since methods for converting tacit to explicit knowledge are problematic. Improving performance requires appreciating the limitations of objectivist and practice-based knowledge management within the context of construction projects as the consideration of performance management measures illustrates.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.