Abstract
In this paper, a new technique of daily peak load forecasting is proposed. At first, we propose Non-linear correction T method as improvement technique of T method that is one of the multivariate analysis techniques, called MT system, suggested in Quality Control. Moreover, we examine the daily peak load forecasting technique, which is based on data in the last year on a forecasting day, by T method and Non-linear correction T method. Furthermore, we examine the technique, which is based on the data of most recent several weeks of a forecasting day, by the T method and Non-linear correction T method. In addition, the effectiveness of the proposed method by comparing the multiple regression analysis is discussed.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: IEEJ Transactions on Electronics, Information and Systems
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.