Abstract

:The ability to assess systems engineering effectiveness within organizations is receiving increasing emphasis. Most of the published research has been generic and domain independent. This article describes a technique to (1) estimate the cost and schedule of projects at an early concept phase, and (2) determine the effectiveness and efficiency of using systems engineering methods and practices on large integration projects in the information technology (IT) sector. A method based on the complexity point concept has been developed and is discussed. This technique has been validated on a number of IT integration projects. Resulting observations are presented in this article. Results do not provide conclusive evidence that systems engineering (on its own) enhanced productivity on specific projects. However, preliminary information indicates that application of formal systems engineering practices and methods, in conjunction with effective project management and test processes, can significantly improve development and integration productivity.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.