Abstract

The integration among the organizational functions managing assets along its lifecycle is a crucial aspect for production companies to implement Asset Management. In this paper, an iterative four-step methodology is presented to support the joint maintenance and production planning considering the system configuration optimization as well. The objective is to overcome the limitations of most of the approaches that can be found in the literature regarding joint optimization models, by integrating it with a system-oriented and reliability-based approach. Reliability, Maintainability and Availability analysis at system level is used to support the traditional joint optimization models. The methodology is applied in an industrial case in the mining sector.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.