Abstract

This paper presents the simulation results of a large-scale offshore wind farm (OWF) connected to the point of common coupling (PCC) of Taiwan Power System using a commercial power-system simulation software. The ultra-high-voltage buses of an onshore substation in Changhua near the potential OWF are properly selected as the connection points. The voltage variations and power factors at the PCC under different lengths of submarine cable and various OWF capacities are simulated and analyzed when the studied OWF is connected to the selected buses. The simulated results can offer a reference for the development of large-scale OWFs in Taiwan in the near future.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.