Abstract

AbstractDam overtopping is one of the major causes of dam breach accidents. Many studies have focused on the estimation of dam overtopping probability. However, the occurrence of a dam overtopping incident is subject to many factors including hydrologic and management factors. In this paper, a model for estimating dam overtopping probability considering spillway gate maintenance activity is established based on Bayesian networks (BN). The interactions between factors that can form a loop in causality are decomposed, and the probability representing the feedback effect is calculated for BN construction. The model is applied to an arch dam with three spillway gates. Statistical data and expert domain knowledge are used to quantify the relationships between variables. The results of a case study demonstrate that gate maintenance activity can significantly influence the occurrence probability of dam overtopping. Inspection frequency and individuals’ situational awareness are important factors that need to be ...

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.