Abstract

This paper is aimed at reducing the costs, maintaining the quality and designing the plant layout that is flexible to meet the customer demand. A number of stations in the after test assembly and after paint assembly are selected for capturing the production process requirements. Then, failure mode and effects analysis of after test assembly is carried out. Layout designs for the after test assembly and after paint assembly are developed using systematic layout planning and are validated using Spaghetti diagrams. With the improved layout, considerable reduction in the distance moved by the operator has resulted in 20 percent cost saving at 80 percent Takt time.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.