Abstract
The article proposes to reduce the duration of non-rhythmic flow lines on technologically identical processes by using the resource of «flow-line non-critical» divisions on interdependent works. In non-rhythmic flow-line construction, there are processes with a reserve of non-used resources with adjacent works («flow-line non-rhythmic» works). As a result of the system study, it is proposed to characterize «flow-line non-critical» works as having an increased period of deployment or convolution of flow lines. The work volume is redistributed on technologically identical processes, for which interdependent divisions are determined. General new working deadlines are limited by the target function. Additional restrictions determine the limits of change in the term of work on intermediate divisions. Optimized works are performed in two variants for three and two shifts. This method is more effective in reducing construction and complements the optimization method by reducing the deployment period.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.