Abstract

To assess the production capacity of a construction and installation organization, the actual volume of work performed for a certain period and planned indicators for the use of certain resources are used. Since the state of production facilities depends not only on the production program, but also on the current state of labor resources, the actual task is to choose the most effective criteria for planning and evaluating the production capacity of a construction and installation organization. In formulating the criteria, the author was guided by the theory, allowing to establish the relationship between the production capacity of building-assembling organizations and production program and capabilities assessment and planning of production capacity for the coefficients of their extensive and intensive use. The study made it possible to form a system of indicators for planning and evaluating the production capacity of a construction and installation organization. The purpose of forming a system of indicators for planning and evaluating production capacities is to take into account in the calculations not only the actual and planned volumes of construction and installation works, but also indicators that reflect the current state of labor resources. The study revealed that through the formation of a system of evaluation indicators, taking into account the impact on production capacity of quantitative and qualitative factors expressed in the structure of labor resources, their qualifications on the one hand, as well as the rhythm and load of the construction and installation organization on the other hand.

Highlights

  • An integral part of the construction and installation organization is the production facilities that integrating various types of resources

  • To evaluative the average annual production capacity in the planned year, it is necessary to consider the actual number of employees involved in the execution of construction work, the ratio of involved labor, as well as a factor of production by one worker of construction works

  • The study of methods for planning and evaluating production capacities allowed us to establish the relationship between production capacity and the number of employees and their output, the rhythm of construction and installation work, the structure of professional groups of workers, the volume of construction and installation work performed

Read more

Summary

Introduction

An integral part of the construction and installation organization is the production facilities that integrating various types of resources. One of the sources of increasing the efficiency and reliability of the construction and installation organization is the correct choice of indicators for planning and evaluating production capacity (potential) This assumption is valid, since the maximum amount of construction and installation work performed by the enterprise on its own per unit of time depends on the size of the production capacity. These indicators do not take into account the scope of activity of the construction and installation organization, the selected type of organizational structure and planned indicators. For it is necessary to form a system of indicators estimation the relationship of production with capacity number of employees and their production, the rhythm of construction works, the structure of professional groups of workers and scope of planned and completed construction works

Methods
Results
Discussion
Conclusion
Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call