Abstract
Monitoring systems of a PGSFR (Prototype Gen-IV Sodium-cooled Fast Reactor) in KOREA provide alarms, integrity information in the reactor building, sodium-water reaction information in the steam generator, fuel failure information, and supporting information for maintenance and inspection. In particular, a Post-Accident Monitoring System (PAMS) provides primary information for operators to assess the plant conditions and perform their role in bringing the plant to a safe condition during an accident. Some PAM variables can be allocated as more two types. It is important for system designers to confirm the suitability of the selection of PAM variables. In addition, the PAMS is a position 4 display against common cause failures of safety I&C systems. The position 4 display should be independent and diverse from the safety I&C systems. The diversity of safety I&C equipment has led to an increase in the design and verification and validation cost. Thus, this paper proposes the system design strategies on the PAMS design problems of the PGSFR in KOREA. The results will be input into a conceptual system design for the PAMS of the PGSFR in KOREA.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.