Abstract
This paper addresses the synthesis problem of non-isothermal water networks using a mathematical programming approach. A heat-integrated water network superstructure and its corresponding mixed integer nonlinear programming (MINLP) model is proposed for the synthesis of individual as well as interplant water networks. A new feature of the proposed model includes piping installation cost within the objective function minimising the total annual cost of the network. This introduces additional trade-offs between operating and investment costs that can impact a final network design. Three examples were solved in order to demonstrate the applicability and effectiveness of the proposed model and solution approach. The results show that additional saving in total annual cost can be achieved by enabling direct water integration between plants. Improved solutions were obtained compared to those reported in the literature considering freshwater and utilities consumption as well as total annual cost.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.