Abstract

We treat the problem of generating cost-optimal schedules for orders with individual due dates and cost functions based on earliness/tardiness. Orders can run in parallel in a resource-constrained manufacturing environment, where resources are subject to stochastic breakdowns. The goal is to generate schedules while minimizing the expected costs. First, we estimate the distribution of each order type by simulation (assuming a reasonable machine/load model) and derive from the cost-function an optimal offset from the due date of each individual order. Second, these optimal offsets are then used to guide the generation of schedules which are responsible to resolve resource conflicts. Third, we evaluate the generated schedules by simulation. The approach is demonstrated by means of a non-trivial case-study from lacquer production. Optimal offsets are derived with the Modest/Möbius tool, schedules are generated using Uppaal Cora. The experimental results show that our approach achieves good results in all considered scenarios, and better results than an approach based on adding slack to processing times.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.