Abstract

A new trigger program is proposed to realize the synchronization of high speed framing camera (HSFC) and intense electron-beam accelerator (IEBA). The trigger program which include light signal acquisition radiated from main switch of IEBA and signal processing circuit could provide a trigger signal with rise time of 17 ns and amplitude of about 5 V. First, the light signal was collected by an avalanche photodiode (APD) module, and the delay time between the output voltage of APD and load voltage of IEBA was tested, it was about 35 ns. Subsequently, the output voltage of APD was processed further by the signal processing circuit to obtain the trigger signal. At last, by combining the trigger program with an IEBA, the trigger program operated stably, and a delay time of 30 ns between the trigger signal of HSFC and output voltage of IEBA was obtained. Meanwhile, when surface flashover occurred at the high density polyethylene sample, the delay time between the trigger signal of HSFC and flashover current was up to 150 ns, which satisfied the need of synchronization of HSFC and IEBA. So the experiment results proved that the trigger program could compensate the time (called compensated time) of the trigger signal processing time and the inherent delay time of the HSFC.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call