Abstract
This paper studies a synchronised scheduling problem of production simultaneity and shipment punctuality in a two-stage assembly flowshop system. Production simultaneity seeks to ensure all products belonging to a same customer order are simultaneously completed (at least as close as possible). Shipment punctuality attempts to satisfy orders’ individual shipment due dates. We provide two criteria, i.e. mean longest waiting duration and mean earliness and tardiness, for measuring production simultaneity and shipment punctuality, respectively. A synchronised scheduling model is developed by balancing the two criteria using linear weighted sum method. A modified genetic algorithm (GA) is then proposed for solving this model. Numerical studies demonstrate the effectiveness of the proposed approach. The results indicate that considering production simultaneity can remarkably reduce finished products inventory. A prioritised weight combination interval for production simultaneity and shipment punctuality has been suggested. Production simultaneity is affected by the production system configuration, especially in peak seasons.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.