Abstract

This article considers the high-multiplicity resource-constrained project scheduling problem with generalised precedence constraints (RCPSP/max). Projects, which can be partitioned into relatively few classes, are to be scheduled subject to resource and generalised precedence constraints. We show that there exists symmetry between projects of the same class and propose two approaches of symmetry breaking: (1) adding additional constraints to the model in the form of precedence constraints, (2) remodelling the problem to reduce the number of variables. To test the usefulness of the symmetry breaking approaches a computational study is completed considering two families of discrete-time based MIP models and a number of state-of-the-art CP-based scheduling approaches. The study shows that both symmetry breaking approaches allow all solving methods to find and prove more optimal solutions. The best CP approach is then used to find a number of new best solutions to relevant problems from the MPSPlib, a multi-project scheduling problem library, for both the total makespan and average project delay objective, whereas the best MIP approach is used to determine a number of tighter lower bounds.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.