Abstract

<p>Sydney Metro’s expansion into the north west of the city has recently included the construction of</p><p>4.5 km of elevated viaduct that includes a one of kind cable rail bridge. Set out on a 403 m horizontal radius with a 130 m long main span, the bridge’s prestressed precast concrete segmental deck is supported by a single plane of cables. An integral part of the design challenge was the need to construct the bridge using the same overhead gantry used to construct the simply support spans on the main viaduct. Using the gantry, the three span structure was first built as a continuous girder supported on the four permanent supports with five temporary supports. The deck sections were erected as a series of cantilevers, then connected into a continuous girder and finally, after the release of the temporary supports, converted into a cable supported structure. A feature of the design was the staging of the deck prestressing that avoided removing strand installed during a previous stage as the bridge metamorphized from a seven-span structure to a three-span structure.</p>

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.