Abstract

Higher capacity testing facilities are being put into service at the Westinghouse Electric Corporation high-power testing laboratories at East Pittsburgh. This paper deals primarily with some of the switchgear and control features of the increased capacity facility.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call