Abstract
Higher capacity testing facilities are being put into service at the Westinghouse Electric Corporation high-power testing laboratories at East Pittsburgh. This paper deals primarily with some of the switchgear and control features of the increased capacity facility.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have