Abstract
This study considers the service restoration problem in medium voltage distribution networks that have a meshed topology but are operated radially. A mixed-integer linear program (MILP) is proposed to incorporate technical constraints as well as practical considerations from the Distribution System Operator (DSO). As a result, a sequence of switching steps that need to be done to restore the power supply to the customers is provided. The proposed methodology can assist the decision making of operators in the control center at the DSO. To demonstrate this, a real distribution network is used in a case study.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.