Abstract

In this paper, a cooperative control algorithm for multiple step voltage regulator (SVR) using correlation of measurement data of distribution line is proposed. Conventionally, the control time constant of a SVR placed on the feeder end side was set slower than a SVR placed on the substation side. The unnecessary tap movement of SVR was reduced by this setting. In this case, on the condition that “the photovoltaic power generation output of the feeder end fluctuates” and “only SVR of the end side works”, it is a problem that control of SVR becomes slow. By the proposed method, the SVR settled in end side of a feeder can change its tap rapidly only if the SVR settled in sending side of a feeder will not change its tap by using proposed method. The features of the method are followings: (1) to estimate tap change possibility of the sending side SVR using correlation model of both of the SVR, (2) only use local measurement data of the SVRs for tap change control. By the proposed method, unnecessary tap change operation and lag of tap control are reduced without communication networks.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call