Abstract

By shifting towards renewable energy sources, manufacturing facilities can significantly reduce their carbon footprint. This environmental issue can be addressed by developing sustainable production through on-site renewable electricity generation and demand-side management policies. In this study, the energy required to power the manufacturing system is obtained from different energy sources: the conventional grid, on-site renewable energy, and an energy storage system. The main objective is to generate a production schedule for a flexible multi-process and multi-product manufacturing system that optimizes the utilization and procurement of electricity without affecting the final demand. A mathematical programming model is proposed to minimize both the total production costs and energy costs, considering a time-of-use pricing policy and an incentive-based program. The uncertainty in renewable energy generation, specifically under the worst-case scenario, is taken into account and the model is transformed into a robust two-stage optimization model. To solve this model, a decomposition approach based on a genetic algorithm is applied. The effectiveness of the proposed model and algorithm is tested on a real industry case involving feed-animal products. A sensitivity analysis is conducted by modifying problem parameters. Finally, a comparison with the nested Column and Constraint Generation algorithm is performed. The obtained results from these analyses validated the proposed model and algorithm.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call