Abstract

The problem of today is a complex study of the multicomponent geotechnical system of large green building projects. The essence of the green building project is to introduce a set of technologies to improve the construction process and minimize future costs. A comprehensive implementation of energy-efficient technologies considered by the author allows obtaining an overall reduction in heat consumption from 30% to 70%, depending on the list of measures and selected technical solutions, as well as on the initial technical condition of the house. Based on these calculations, during the period under consideration, the NPV indicator is positive, and as a result, the proposed project pays off. The payback period of the Energy Efficient Home project is within 10,29 years, and the project is quite efficient. Taking into account the research data, it is planned to develop an algorithm for assessing the geomonitoring of environmental impacts in the development of green building projects.

Highlights

  • The efficiency of regional and municipal ecological regulation for sustainable development goals can be reached only at the general greening of control systems

  • One of the main indicators of project profitability is the internal rate of return or IRR

  • Since cash receipts over the years are not equal, the payback period of the project is calculated on an accrual basis

Read more

Summary

Introduction

The efficiency of regional and municipal ecological regulation for sustainable development goals can be reached only at the general greening of control systems. A problem of today is a complex study of the multicomponent geotechnical system of large green building projects. The geotechnical system shouldn't be aggressive for the environment. Development of environmentally friendly construction projects is very relevant. At the beginning of 2017, SDK-GROUP LLC initiated a project for construction of an “Energy Efficient House” residential complex. A land in the central part of the city with a developed infrastructure and convenient location of transport routes was selected for construction of this complex

Methods
Results
Discussion
Conclusion
Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call