Abstract

Jordan is a dry country which badly needs water bodies. This work proposes a design of a sustainable artificial lake in Jafer basin (JB). The design involves excavating a tunnel to connect Gulf of Aqaba (GoA) and JB, and building a pumping station at the end of the tunnel. The tunnel will have a downslope gradient to allow gravity flow of seawater from GoA to JB. Once the water arrives underneath JB, a series of pumps along an inclined shaft uplift the water into the basin creating an artificial Lake, with total water volume of 2,000 Million Cubic Meters (MCM). The time required to fill up the basin is three years. The tunnel diameter is 3 meters and the depth of the tunnel and the shaft is 1000 m. 2% of the lake surface will be covered by Photovoltaic (PV) panels to produce electricity for pumping and to reduce evaporation rate. The total investment cost is 10.1 B$ (Billion Dollar) spent over three years, after that, all the pumping power needed to counteract evaporation is provided by PV panels. Once completed, the project is expected to pay back by encouraging human settlement, tourism, agriculture and industry.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.