Abstract

Abstract Campus heating and cooling systems present a particular challenge to the incorporation of advances in technology to improve efficiency. An older system is generally more expensive to operate than a newer one would be, but extensive upgrades are often difficult. Lengthy shutdowns affect multiple buildings, and new central heating and cooling equipment is very expensive. Buildings added over the years incorporate various types of systems, affecting central plant operation. Buried distribution piping is costly and can be disruptive to modify. The Institute for Advanced Study (IAS) has been engaged in an ongoing effort to modernize infrastructure and incorporate sustainable design features on its campus in Princeton, New Jersey. Under the direction of IAS Facilities Management, a multi-year plan for campus utility improvements has been implemented. Over the past eight years the same consulting engineers have been involved in each major campus project, providing necessary continuity. The most recent p...

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.