Abstract

PurposeThe purpose of this paper is to identify and prioritize management practices that have the potential to improve labor productivity in multi-storey building construction projects.Design/methodology/approachThe study adopted two-phase mixed-methods research design and 58 project managers, contract administrators and project coordinators were involved in the survey. During Phase I, qualitative data were collected from 19 experts using interviews and the management practices that could enhance labor productivity in multi-storey building construction projects were identified. In Phase II, quantitative data were collected from 39 contractors involved in the delivery of multi-storey building projects by using questionnaires. The data were analyzed to prioritize the practices identified in Phase I.FindingsWell-defined scope of work, safety and health policy, safety and health plan, hazard analysis, long-lead materials identification, safe work method statement, and toolbox safety meetings are the top seven practices that have the potential to improve labor productivity in multi-storey building projects.Originality/valueThe research identifies the management practices that can be implemented to enhance labor productivity in multi-storey building construction projects in the context of Australia. Being the first study in the Australian context, the findings can be used as benchmark for international comparison.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.