Abstract
Recent field tests on motors in service on pipelines and powerhouse systems have shown that the switching surge voltage appearing at the motor terminals during initial energization for starting frequently reach magnitudes approaching 2.0 per unit normal crest line-to-ground operating voltage with time-to-crest as short as 0.2 As. This is more severe than normally believed and may endanger turn-to-turn insulation.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: IEEE Transactions on Industry and General Applications
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.