Abstract

As a new method, the three-bench seven-step-excavation method is more and more adopted by the construction of large span tunnel in weak rock mass. At the portal of Yunyangshan tunnel, there is a long section of the mild clay stratum. Considered that the whole excavated cross section area is very large, the three-bench seven-step-excavation method was adopted. In order to investigate the surface settlements caused by the construction of twin tunnels, three typical cross-section were selected. At each section, the ground surface settlements were monitored. It is shown that the depth of tunnel and the construction time of twin tunnels have influence on the surface settlement curves, and the three-bench seven-step-excavation is effective in the mild clay stratum.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.