Abstract

At present, the shield method is a commonly used construction method in underground engineering construction. During the shield construction of two-way parallel tunnels, there will be mutual influence between the tunnels. In this paper, taking Xi'an Metro Line 6 as an example, combined with relevant stratigraphic data, the discrete element software (MatDEM) is used to simulate the sand and gravel stratum under the shield tunnel, and the influence of uneven surface loads on the surface settlement of the sand and gravel stratum tunnel is studied. Studies have shown that single sand and pebble formations have higher stress values but less surface settlement, while mixed clay-sand and pebble formations have significantly higher surface settlement, with vertical settlement increasing and then decreasing with depth of burial.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.