Abstract
Due to the high plasticity index and low permeability of reclaimed ground composed of dredged soil, the reinforcement period is very long, which makes the merits of vacuum preloading, short reinforcement time, disappear. Surcharge preloading method becomes the most suitable and economic way. The equivalent permeability method is used to simulate the installation of the plastic vertical drain and the influence of different permeabilities, namely the interval space is calculated numerically.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: IOP Conference Series: Earth and Environmental Science
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.